Start here#
An Agent Workspace gives people and agents the same place to read project guidance, see who owns the work, and review the result. Use Requirements for the outcome you want and how you will verify it. Use Tasks for the work someone can carry out. A team can start with just tasks and add requirements when it needs more traceability.
Create a Standard Agent Workspace to start with a project structure and working process, or choose an empty workspace. The Standard starter includes a README, editable governance documents, and a Specs folder. If you want to tailor it before bringing in a lead agent or other agents, edit the starter documents first. In Settings, open Governance documents and select Edit document links to link documents such as the Working Agreement or Agent Directions. The linked documents explain how to work. They do not give people or agents more permissions.
For a first trial, connect the project's MCP connection to your agent client and say “Onboard into this project.” Give the project name if the connection can see more than one. The agent should confirm the project and its connected identity, load the Agent Workspace collaboration guide from the Project Artifacts skill when available, read accessible linked guidance, and check its own assignments. If it has an onboarding assignment, it should complete that assignment after reviewing the guidance. A read-only connection does not gain the ability to create or assign ordinary work.
Requirements#
Use the workspace’s Requirements tab to manage requirements and their linked work. See Manage requirements in an Agent Workspace for creating requirements, importing selected ReqIF records, and working with Chat or a connected assistant. The Markdown and PDF summaries described here are not ReqIF exports.
Write down the intended outcome, why it matters, and how someone can verify it. Link a more detailed spec when you need it. A Draft is a proposal; Approved means the team has agreed on the intent. Withdrawn records a change in intent, and Archived keeps the record out of active use. Neither withdrawing nor archiving a requirement means all its linked tasks should stop; first review which work it affects and which tasks still support other requirements.
Look for relevant work before creating duplicate tasks. Link existing tasks where they fit. A requirement can link to several tasks, and a task can contribute to several requirements. When a linked task is blocked, use the task to see what needs attention if you have access. A blocker on linked work does not change the requirement's status.
Review three things separately:
- Coverage: Do the linked tasks address the requirement?
- Progress: How much of the linked work is under way or done?
- Verification: Does the evidence show the intended outcome was achieved?
A completed task is not proof that its whole requirement has been met. If the requirement changes, revisit its links and evidence instead of silently carrying over an earlier conclusion.
When Export is available in Requirements, choose the scope you want and download a readable Markdown or PDF summary. You can include optional fields such as group, priority, and effort. Export uses records you can read and does not save a new workspace document or create a public share. If the summary is too large, reduce the selection and try again.
Tasks and subtasks#
Start a task in Draft while you work out the definition of done, assignee, and any supporting spec. Add and order subtasks if they help explain the plan. Opening a draft makes it available for work. Opening does not claim or assign it, and an agent should not pick up work assigned to someone else or claim unassigned work.
A subtask makes part of the parent task easier to assign and review. Order suggests a sequence; it does not make the next task depend on the previous one. Use an explicit dependency when another task should finish first. An unfinished prerequisite marks a task Waiting, not manually Blocked. Waiting is advisory: it helps you plan the order without preventing someone from starting the task. Review progress from the parent task and inspect the individual children when you need to see their status.
A subtask assignee uses Complete subtask to add evidence and move the subtask directly to Done, without a separate review step. An authorized reviewer can reopen a completed subtask for rework without stopping the other subtasks. All subtasks must be Done before the parent can be submitted.
For the parent task, the assignee submits evidence against its definition of done. The parent moves to Ready for review and still needs independent review. The reviewer can accept the work or return it with a concrete reason. Use a Status note (optional) to explain a status change, or add a task comment for a substantive update, decision, or blocker.
Repeated rework can trigger a warning and eventually pause the task for an owner or admin to review. If you see a pause, stop work on that task. Use the discussion to clarify the intended outcome or acceptance criteria. An owner or admin must select Unlock task before you resume.
Find work by ID#
Each Agent Workspace assigns its own permanent IDs: REQ-042 for a requirement, TASK-12 for a task, and STASK-123 for a subtask. IDs are assigned when the record is created, including drafts, and are never reused within the project. STASK-123 (TASK-12) shows the subtask followed by its parent. In Tasks, use Find task by ID to open a task or subtask, including a draft or completed item. In Requirements, enter the full requirement ID in the search field.
Connect and automate#
In your account, go to Applications / Agents, then Connected Agents, and choose New Connected Agent for the project. Use Read only to observe or Read and write when the agent needs to act and the project gives it that authority. For compatible browser sign-ins, select the project and the named agent if offered. Signing in as yourself is a personal connection, not the agent's identity. For a client that supports OAuth client credentials, save the client secret securely when it is shown; do not paste it into chat. Check the connected identity if you switch agents, because clients may reuse a sign-in.
Before relying on automatic monitoring, verify both how the client learns about changes and whether it can actually resume work:
- Try project-scoped Markdown Logic Events first. If the client and connection offer the native workspace subscription, verify that it receives a relevant event and can wake the agent. A subscription by itself is not proof of delivery or wake.
- Use a scheduler if Events do not work. If the client can run a real background job, verify it is armed to check at least every five minutes while the agent is on duty. In either mode, check at onboarding or resume and immediately after finishing work.
- Say when neither mode works. Tell the operator that the client cannot check automatically and will check on resume or when prompted. If the client offers
create_commentfor a project-bound Connected Agent with project write access, leave one notice in the project’s Comments tab. SupplyprojectId,body, andidempotencyKey; omitdocumentId. This does not notify the operator separately. If the agent cannot post there, tell the operator. Do not create dummy work or repeat the same notice.
For polling, use get_workspace_context_updates when the connection offers it. Without since, it only covers the most recent five minutes. On onboarding or resume, reconcile current assignments separately. Pass the last successful asOf back as the next since even after an empty result, and keep checkpoints separate for each project and connected identity. On error keep the last valid checkpoint. If an incomplete response advances, continue from its new checkpoint; if it stalls or resets, reconcile current assignments and relevant sources with targeted tools. Unavailable coverage is not an empty result: check coverage for ordinary project comments and eligible secret metadata. Native participation events are a separate feed. For a file change, compare metadata or the content hash before fetching the current content or an exact version diff.
Use Secrets for shared settings or credentials rather than pasting values into documents, tasks, or comments. A reference such as secret://SERVICE_URL names a value; it does not substitute it. Authorized users and agents retrieve a needed value separately. Change notices do not contain those values.